Energy Conservation Activities Planned in 2008-09 (Water Supply System)
| Sr. No. |
WW/ WDS |
Changes made/ Activities to be Carried out |
Qty. |
Expected Saving in Energy Consumption
(KWH/ annum) |
Expected Saving in Energy Bill
(Rs./ annum) |
| 1 |
Sarthana Water Works |
Replacement of bowl & column assembly of Pumps at Intake Well |
3 Nos. |
569,660 * |
2,404,600.00 |
| 2 |
Katargam Water Works |
Replacement of bowl & column assembly of Pumps at Intake Well |
8 Nos. |
530,491 * |
2,141,450.00 |
| |
|
Bypass of Khatodara WDS to transmit water from KWW |
|
1,695,385 * |
6,825,630.00 |
| 3 |
Khatodara WDS |
Replacement of NRV/ SV etc. |
Lot |
168,752 * |
712,130.00 |
| 4 |
Katargam WDS |
Replacement of NRV/ SV etc. |
Lot |
257,949 * |
1,142,710.00 |
| 5 |
Umarwada WDS |
Replacement of NRV/ SV & Piping etc. |
Lot |
732,102 * |
3,074,820.00 |
| 6 |
Pandesara WDS |
Repairing of Zero Velocity Valve/ Replacement with appropriate size valve |
1 Nos. |
477,189 * |
1,986,170.00 |
| PP |
Sub Total (Saving) |
PP |
PP |
4,431,528 * |
18,287,510.00 |
| 7 |
Sarthana Water Works |
Installation of 2 MW Wind Turbine Generator(s) for SWW |
NEG 3.60 GWH/ annum* |
15,686,300.00 |
| PP |
Net Saving (Expected) |
Rs. 339.74 lacs per annum |
Note:
1. * = Calculations are made as per latest situations (Apr-2008).
2. NEG means Net Ennergy Generation.
3. 1 GWH = 1 million KWH.
|