(1) Augmentation of water supply at Sarthana, Katargam & Rander Water Works:

Detailed Project Report for "Augmentation of water supply at Sarthana, Katargam & Rander Water Works" is approved by Ministry of Urban Development, Government of India under Jawaharlal Nehru National Urban Renewal Mission. Total Cost Estimates for all the project components is Rs.140.68 Crores. All these project components will be implemented in the timeframe of two years and will be completed by March, 2009.

Objective of the project

  • To ensure adequate capacity of drawal and treatment at source.
  • Cater to present needs as well as well the future needs upto the year 2021 and with facility to augment the system for the needs of the year 2036.
  • To satisfy the above object the following components have been proposed :
    1. Intake well in River alongwith pumphouse.
    2. Water Treatment Plant.
    3. Transmission lines upto Water Distribution Stations.

Details of project components of approved DPR are given in the table below.

Sr. No. Description Estimated Amount of
Project (Rs. in Lacs)
(1)   Sarthana Headworks
  (a) 360 mLd capacity intake well, pumphouse, approach bridge etc.  
    i Civil works 897.63
    ii Mechanical & Electrical works 335.85
  (b) 150 mLd capacity Water Treatment Plant 1709.42
  (c) Booster house on existing UGSR.  
    i Civil works 43.53
    ii Mechanical & Electrical works 294.56
  (d) Transmission main from Sarthana to Umarwada 2486.08
  (e) Transmission main at Anjana 80.08
(2)   Katargam Headworks
  (a) 263 mLd capacity intake well, pumphouse, approach bridge etc.  
    i Civil works 724.77
    ii Mechanical & Electrical works 273.47
  (b) 150 mLd capacity Water Treatment Plant 1804.42
  (c) Booster house on existing UGSR.  
    i Civil works 43.52
    ii Mechanical & Electrical works 480.09
  (d) Interconnection pipe between old and new booster house 114.22
  (e) Transmission main from Katargam WW to Ved WDS 316.03
  (f) Transmission main from Khatodara to Pandesara Industry 946.34
(3)   Rander Headworks
  (a) Additional Mechanical and Electrical works at existing intake 46.44
  (b) 50 mLd capacity Water Treatment Plant 784.38
  (c) Transmission main from Rander intake to Rander WW 602.02
  (d) Transmission main from Rander WW to Joganinagar 1156.86
  (e) Transmission main from Athwa gate to Athwa WDS 519.19
Total 13658.89
Add 3% contingency 409.77
Grand Total 14068.65


Details of components proposed

Component Required Existing Proposed
Rander Head Works      
Inake well (Year 2036) 340 mLd 360 mLd Nil
WTP (Year 2021) 250 mLd 200 mLd 50 mLd
Transmission mains (Year 2036) 24.13 Km 13.50 Km 10.63 Km
  (900 to 1500 mm) (900 / 1000 / 1500 mm) (1000 / 1400 / 1500 mm)
Katargam Head Works      
Inake well (Year 2036) 503 mLd 240 mLd 263 mLd
WTP (Year 2021) 398 mLd 240 mLd 150 mLd
Transmission mains (Year 2036) 34.20 Km 24.20 Km 10.00 Km
  (550 to 1500 mm) (550 to 1500 mm) (900 / 1150 mm)
Sarthana Head Works      
Inake well (Year 2036) 600 mLd 240 mLd 360 mLd
WTP (Year 2021) 453 mLd 320 mLd 150 mLd
Transmission mains (Year 2036) 25.20 Km 24.30 Km 10.90 Km
  (750 to 1600 mm) (1000 to 1600 mm) (750 / 1500 / 1600 mm)

Salient features of the proposed project

Sr. No. Item  
1 Project area in Sq.km. 112.89
2 Population (persons)  
  Year 2021 55,05,575
  Year 2036 73,59,762
3 Rate of Water Supply 150 lpcd + 15% UFW = 180 lpcd
  i Water Demand (year 2021) 1090 mLd (including industrial)
  ii Water Demand (year 2036) 1424 mLd (including industrial)
4 Intake Well 263 mLd capacity intake at Katargam
  360 mLd capacity intake at Sarthana
5 Water Treatment Plant 50 mLd capacity at Rander
  150 mLd capacity at Katargam
    150 mLd capacity at Sarthana
6 Booster House On existing UGSR at Katargam
    On existing UGSR at Sarthana 
7 Mechanical and Electrical works Additional P/M at existing Rander Intake well
  At proposed intake well at Katargam
  At proposed intake well at Sarthana
  At proposed booster house at Katargam
    At proposed booster house at Sarthana
8 CW Transmission main to various WDS 31.60 km MS pipeline of 900 to 1600 mm dia.
9 Capital Cost of the Project  Rs. 14068.65 lakhs
10 Cost of O&M / family / annum  
Year 2009-10 Rs. 408.00
Year 2021 Rs. 804.00