• Location Construction of swimming pool at T. P. S. No. 13,F.P.No-132, Near Joganinagar, Surat.
  • Total Plot Area 5000 Sq.mts.
  • Estimate Sanctioned General Board Res.No.241/96, Dtd.29/05/96
  • Tender Sanctioned Standing Committee Reso.No. 1244/97, Dtd-09/09/99
  • Tender Amount Rs. 1,47,03,948.00
  • Time Limit 09 (Nine) Months
  • Contractor Mayur Construction Co., Prakash Talkies Compound, Station Road, Surat.
  • Date of Work Start 13/11/1999
  • Date of Completion 30/04/2001
  • Total Project Cost
    Sr.No Description Amount
    A Swimming Pool Rs.1,54,10,000.00
    B Compound Wall Rs. 4,54,000.00
    Total  Rs.1,58,64,000.00
  • Project Details
    Sr. No. Description Details
    .A Racing and Diving Pool - Size 50.00 mt x 25.00 mt. x 1.07 mt to 3.50 mt.
      Racing and Diving Pool - Capacity 30,08,000 Ltrs.
      Racing and Diving Pool - Lane Eight
      Racing and Diving Pool - Spring Board 1.00 mt. height & 3.00 mt. height
      Racing and Diving Pool - Diving Board 1.00 mt. height & 3.00mt. height
      Racing and Diving Pool - Take off platform Eight
      Racing and Diving Pool - Ladder Six
    B  Main Building - Size 41.23 int. x 8.47 mt. = 350 Sq.mt.
       Main Building - Waiting Hall 1
       Main Building - Office 1
       Main Building - Store Room 1
       Main Building - Filtration Plant Room 1
       Main Building - Shower  18
       Main Building - Locker Room 2
       Main Building - Open Shower 16
       Main Building - Toilet 6
    D Balancing Tank - Capacity 1,50,000 Ltrs.
    E Filteration Plant - Horizontal Type Pressure filter unit  2 Nos. of 2.40 mt. dia x 4.30 mt length 
      Filteration Plant - Centrifugal Pump 3 Nos. Capacity - 200 Cmt/Hr.
      Filteration Plant - Blower 2 No.
      Filteration Plant - Chlorination Equipment 1 No.
      Filteration Plant - Alum Dosing and Soda Ash Equipment 2 No.
    D Electrification - Under Water Light 28 Nos. , 32 W.
      Electrification - Deck Pole 15 Nos. , 70 W.
      Electrification - Flood Light 19 Nos. , 250 W. Metal Halide